RJ Bull were commissioned by Wessex Rivers Trust to deliver a targeted restoration project on the Bourne Rivulet winterbourne system, close to its perennial head. The work focused on reinstating natural chalk stream processes and habitat diversity within a highly modified, historically straightened channel while maintaining existing floodplain function and ecological integrity.

MAKE AN ENQUIRY

What did we do?

The works focused on reinstating natural chalk stream form and function within a historically straightened and over widened channel. Approximately 190 m of channel was restored, with an additional 15–20 m of channel length created through localised re-meandering.

Channel reprofiling and bank regrading were undertaken to introduce greater variation in bed depth and cross-section, improve riparian wetting and restore natural chalk stream characteristics. Historic bunds were selectively removed to reconnect the channel with its floodplain, while a low-profile raised bund was constructed to manage floodplain return flows and maintain flood risk neutrality.

A total of 12 in-channel and floodplain habitat features were installed, including three larger soil-backed structures. These incorporated complex large woody material to increase flow diversity, improve fish cover and encourage natural geomorphic adjustment. A relic water meadow hatch structure was eased to improve fish passage through the system.

Native riparian seeding and planting were completed to stabilise regraded banks and enhance biodiversity. Willow use was deliberately limited in areas to reduce future management requirements, and two kingfisher chambers (four boxes) were installed to provide additional nesting opportunities.

The challenges?

  • The project was delivered within a sensitive winterbourne chalk stream system, close to the perennial head of the Bourne Rivulet, where flows are seasonally variable and can return rapidly following rainfall.
  • The channel flowed intermittently and was dry for extended periods, requiring careful programming to take advantage of suitable working windows while retaining flexibility should flows resume. Ground conditions across the site were soft, necessitating the use of low ground pressure plant to minimise compaction and disturbance.
  • Ecological sensitivities, including the presence of protected species, required ongoing ecological supervision and pre-felling checks. Historic flood risk constraints also influenced the design, requiring the restoration to maintain or improve floodplain function without increasing downstream flood risk.
  • Limited availability of larger bed gravels meant that recovered material had to be used strategically to armour features and protect finer substrates, particularly around existing structures.

What were the results?

The completed works have successfully restored natural chalk stream processes within a modified winterbourne channel, delivering increased geomorphic and habitat diversity.

Channel complexity has been significantly improved through re-meandering, reprofiling and the introduction of large woody material, resulting in enhanced flow variation, improved fish habitat and increased riparian wetting. Floodplain connectivity has been restored while maintaining flood risk neutrality, with additional inset floodplain storage providing resilience during higher flows.

Fish passage has been improved through the easing of historic barriers, and biodiversity has been enhanced through native planting, kingfisher nesting provision and the creation of refuge habitats. The restoration has delivered a robust, process-led outcome designed to function effectively within the seasonal dynamics of a winterbourne chalk stream.