River restoration of a historical site: Southington Mill

Historical and existing structures can sometimes prevent rivers from functioning naturally. At Southington, a 300m stretch of the River Test had fallen into poor ecological condition due to the impounding effect of a mill/turbine structure. This barrier prevented fish passage and caused the river to back up, with negative impacts on habitat quality, flood risk, and biodiversity.

Make an enquiry

R.J.Bull Limited was contracted to restore Southington, a 300m stretch of the River Test. Working with the Environment Agency and Natural England who were funding contributors, and input from the Test & Itchen Restoration Strategy, the objective was to improve the stretch of river that was in very poor condition due to the impounding effect of a mill/ turbine structure preventing fish passage and impounding the river for 300m upstream.

Before: impounding structure and silt deposits

What did we do?

  • Removed the impounding structure: Dismantled the 1.5m-high mill/turbine barrier, reconnecting the channel to 4km of upstream river where previous restoration had already improved habitat and spawning grounds.
  • Restored a natural chalk stream: Re-shaped the river to create a varied, self-sustaining chalk stream habitat with natural riffles and pools.
  • Enabled fish passage: Designed rock ramps to provide passage for a wide range of species and life stages.
  • Protected key habitats: Retained and improved flow to a small carrier stream (SSSI) and ensured fish passage at its offtake.
  • Protected silt and ecology: Retained 3,000 tonnes of upstream silt deposits and avoided full dewatering of the upper reach during works.
  • Preserved local heritage: Retained and restored the historic mill race, bridge, mill pool, and railings – all centuries old – while enabling a full archaeological excavation of the mill site.
  • Maintained local water supplies: Preserved flow to an ornamental pond within the adjoining golf course.
  • Reduced flood risk: Lowered water levels and improved conveyance to reduce flood risk to the surrounding village, properties, and golf course.

This also allowed an archaeological excavation of the river bed and mill area. The project ensured we worked closely with the local community; Overton Parish Council, Overton Historic Society, Overton Recreation Club, for input on the archaeological dig, pre works surveys, and throughout the project planning and delivery.

The Challenges

Due to the surrounding environment and historical nature of the site there were a number of elements to manage throughout the project:

  • Limited space and site access due to adjoining properties meant negotiating access for larger machinery
  • When dropping water level by 1500mm had to maintain flow to stream and adjoining golf course pond, only using natural materials to form the rock ramps
  • Due to unmanaged nature no knowledge of what laid under 1.5m of silt from the mill/ turbine
  • Managing multiple levels with rock ramps to ensure fish passage as well as the lift required
  • Retaining the flow to the section of river downstream for the 4 weeks of the dry down stage
  • Accommodating the historic nature of the site, refurbishing the mill area to keep its character once project completed, and supporting full scale archaeological dig around the site during work

During: silt deposits drying down and coffer dam in place allowing dry working on rock ramp

After: clean clear beds, good weed growth and fish passage

What were the results?

  • Flood risk reduction: Removal of the impounding structure reduced flood risk for the surrounding village, golf course, and residential properties.
  • Community involvement: Local groups were actively engaged throughout the project, including involvement in archaeological excavations and post-project presentations to schools and biodiversity groups.
  • Heritage conservation: The historic mill site, in place since before the Domesday Book, was retained and sensitively restored, preserving its character within the village conservation area.
  • Ecological transformation: The river now functions as a natural chalk stream, with free fish passage, improved water quality, and diverse habitats.
  • Long-term resilience: The channel is now self-sustaining, requiring no intervention to adapt to variations in water levels and flows.

The project continues…

Restoration is never truly finished. At Southington, the long-term goal is to achieve full, unobstructed fish passage along the entire length of the River Test. As the sole contractor, R.J. Bull Limited has continued to develop the site, building on the success of the initial works.

Explore below to see how we have restored further sections of the river, creating healthy, resilient habitats that support biodiversity for years to come.