The River Stort Phase 2 project focused on restoring a heavily modified 350m stretch of river that had been impacted by historic gravel extraction and diversions. The reach suffered from poor in-channel habitat, severe bank erosion—particularly along the true right bank—and rapid fluctuations in water levels following rainfall. The site is adjacent to a lake and a sewage treatment works, with additional challenges including invasive species (Himalayan Balsam, Giant Hogweed, and Demon Shrimp), water vole presence, overhead high-voltage power lines, and restricted machinery access.
R.J. Bull Ltd were commissioned to enhance biodiversity, stabilise eroding banks, improve ecological function, and create targeted wildlife refuges, including kingfisher nesting habitats, while maintaining a safe and sustainable working environment.
Project Aims
The project aimed to restore the ecological and physical function of the River Stort by implementing nature-based solutions, modifying in-channel features, stabilising eroding banks, and establishing habitat structures. A key goal was to improve flood resilience, support aquatic and riparian species, and provide safe wildlife refuges for kingfishers and other native fauna. Additionally, the project sought to integrate sustainable practices by reusing in-situ materials to reduce the environmental footprint of construction.
What did we do?
- Careful planning, ecological consideration, and low-impact construction techniques were used throughout.
- Site fencing and access points were established before works began.
- Tree works and material winching were carried out to form brash berms and deflectors.
- 14 brash and large woody debris berms were constructed, each around one-third of the channel width and up to 10 m long.
- Four large deflectors and hinged trees were installed to enhance flow variation and in-channel habitat diversity.
- Bank regrading took place in erosion-prone areas to stabilise channel margins.
- Two kingfisher nesting banks were created using willow and on-site materials.
- Riparian planting and seeding with wetland and meadow species improved marginal and bankside habitats.
- A sequential downstream construction approach minimised ecological disturbance.
- Surplus materials from Phases 1 and 2 were repurposed to form backwater features, boosting habitat diversity and reducing carbon footprint.
What were the challenges?
- Restricted access due to narrow banks, weight-limited bridges and overhead power lines.
- Biohazard risks from the nearby sewage treatment works required careful management.
- Presence of water voles and invasive species demanded strict ecological controls.
- Low-ground-pressure machinery was used to minimise impact.
- Access was prioritised via the true right bank where possible.
- Wader-only water access was implemented with decontamination stations.
- Ongoing monitoring ensured compliance with ecological and health & safety requirements.
What were the results?
The project successfully restored 350m of channel habitat, stabilised erosion-prone riverbanks, and established 18 natural in-channel features. Two kingfisher nesting habitats were created, while biosecurity and public safety risks were effectively managed throughout the project. Light penetration and channel diversity improved, flood resilience was enhanced, and in-channel features provided additional high-flow refuge areas. The reuse of natural materials and low-impact techniques exceeded the original brief, improving both sustainability and ecological outcomes.
Ongoing monitoring by HMWLT will track bank stability and ecological improvements, and a planned Phase 3 will focus on upstream connectivity to further enhance the river corridor.