Restoring a Disused Watercress Site

RJ Bull delivered a full design-and-build restoration of a redundant former watercress site, transforming it into a functioning chalkstream and diverse wildlife wetland. The completed works reinstated natural river processes, enhanced biodiversity, and created a resilient, multi-habitat landscape.

MAKE AN ENQUIRY

RJ Bull was appointed to lead both the design, concept development, and construction of works to restore a disused watercress site into a functioning chalk stream and wildlife wetland. The site contained redundant concrete infrastructure, over-engineered channels, and degraded habitats that no longer supported ecological value.

Through an integrated design-and-build approach, we reimagined the area as a high-value wetland and chalk stream system, delivering biodiversity enhancement, natural flood storage, and long-term landscape resilience. Following completion of the design phase, RJ Bull has now successfully delivered the restoration works on site, transforming the former cress beds into a thriving wetland mosaic.

Project Objectives

  • Reinstate 130m of functional chalk stream.

  • Transform redundant cress beds into a multi-depth wetland system.

  • Create diverse habitats to support priority and protected species.

  • Integrate natural flood management and resilience into the landscape.

  • Deliver a practical, buildable scheme through RJ Bull’s design-and-construct expertise.

Pre Works

Pre Works

River Works

Wetland Works

What We Did

RJ Bull delivered the project through a fully integrated design-and-build approach, taking the scheme from initial concept and technical development through to construction and habitat establishment on site.

Design & Technical Development

  • Undertook ecological, hydrological, and topographical assessments to inform a practical and buildable restoration design.

  • Developed channel reinstatement and wetland creation proposals that balanced ecological enhancement with floodplain function.

  • Designed new chalk stream morphology including bed reprofiling, gravel introduction, and riffle–pool sequences.

  • Produced detailed construction drawings, habitat plans, and planting specifications to guide delivery.

  • Integrated protected species mitigation and ecological enhancements, including bat and bird features, into the design from the outset.

Site Preparation & Enabling Works

  • Completed a supervised fish rescue prior to in-channel works to safeguard aquatic species.

  • Drained and isolated work areas to allow safe and environmentally sensitive construction.

  • Desilted historic channels and redundant cress beds to restore capacity and improve water quality.

  • Removed all redundant on-site infrastructure, including concrete structures and obsolete watercress bed features.

  • Cleared and responsibly disposed of legacy materials while protecting retained habitats.

Channel & Wetland Construction

  • Reprofiled the stream bed and banks to reinstate a natural chalk stream form.

  • Narrowed and reshaped over-wide channels to improve flow diversity and ecological function.

  • Created a multi-depth wetland system with shallow scrapes, marginal shelves, and deeper refuge areas.

  • Reconnected the channel with its floodplain to enhance natural flood storage and seasonal inundation.

Habitat Creation & Enhancements

  • Installed wildlife features including a purpose-built bat house and additional ecological enhancements across the site.

  • Established marginal planting, reedbeds, and wet meadow habitats to support long-term biodiversity gains.

  • Delivered habitat structures designed to support priority species and improve ecological resilience.

The challenges?

  • Redundant Concrete & Infrastructure
    The former watercress operation left extensive concrete structures and obsolete features throughout the site. Careful removal was required to avoid pollution risks, protect retained habitats, and maintain site stability during works.

  • Heavily Modified & Degraded Channels
    The existing channels were over-wide, silted, and lacking natural form. Restoring chalk stream processes required significant reprofiling while maintaining water management and downstream flow continuity.

  • High Silt Loads & Historic Sediment Build-Up
    Decades of inactivity had resulted in substantial sediment accumulation. Desilting had to be undertaken sensitively to prevent turbidity impacts and protect aquatic species.

  • Working Within an Ecologically Sensitive Setting
    Proximity to a chalk stream SSSI required robust ecological mitigation, timing restrictions, and supervised operations, including fish rescue and species protection measures.

  • Balancing Ecology with Floodplain Function
    The design needed to deliver biodiversity enhancement while also increasing flood storage and maintaining hydraulic performance across the site.

  • Access & Construction Logistics

What were the results?

The completed scheme has successfully transformed a redundant and degraded former watercress site into a fully functioning chalkstream and wildlife wetland. A total of 130m of chalkstream has been reinstated with improved channel form, flow diversity, and gravel-rich habitats, while historic cress beds have been converted into a varied multi-depth wetland supporting a wide range of species. The removal of obsolete concrete infrastructure and extensive desilting works have enhanced water quality, restored natural processes, and significantly improved the landscape’s ecological value. New reedbeds, marginal habitats, wet meadows, and wildlife features  have delivered measurable biodiversity gains. Reprofiling and reconnection of the floodplain now provide increased natural flood storage and resilience, resulting in a flagship example of integrated chalkstream and wetland restoration delivered through RJ Bull’s design-and-build approach.