Restoring 100m of chalk stream on the River Itchen

Following the removal of a sheet pile weir in 2010, a central section of Rosemary’s Leet became overly shallow and fast flowing. This reduced its suitability for fish spawning and created higher predation pressure. The channel lacked habitat diversity compared to adjacent reaches, prompting the need for targeted restoration to enhance fish passage, improve habitat complexity, and stabilise banks.

Make an enquiry

Following the removal of a sheet pile weir in 2010, a central section of Rosemary’s Leet became overly shallow and fast flowing. This reduced its suitability for fish spawning and created higher predation pressure. The channel lacked habitat diversity compared to adjacent reaches, prompting the need for targeted restoration to enhance fish passage, improve habitat complexity, and stabilise banks.

Project Aims

The main objective of the project was to improve fish passage through the section while creating a more diverse and resilient aquatic habitat. By restoring depth variation and introducing in-channel features, the project sought to support natural pool-riffle sequences, enhance refuge areas, and reduce bank erosion. Additional objectives included integrating supplementary tree planting and stabilising vulnerable banks to improve long-term ecological function.

What did we do?

  • Detailed assessment of the existing channel and refinement of earlier bed-raising works.
  • Two riffles enhanced using flint rejects and recovered gravels to create varied flow paths.
  • Two alternating gravel berms constructed to increase channel sinuosity and provide fish refuge.
  • Large woody debris structures installed to promote scouring, deepen pools and diversify flow.
  • 10m of eroding left bank stabilised with pinned tree trunks and sedge berms.
  • Native willow saplings planted at key points to increase shading and long-term habitat value.
  • Site-won materials reused to reduce environmental impact.
  • Biodegradable machinery oils and pollution prevention measures used to minimise ecological disturbance.

What were the challenges?

  • Works were carried out below bankfull height to maintain flood conveyance.
  • Only four machinery movements were permitted across the meadow, demanding precise planning.
  • Access was limited and carefully managed to minimise ground disturbance.
  • Strict pollution prevention measures were enforced, including silt curtains.
  • All refuelling took place at a safe distance from the watercourse to reduce environmental risk.

Introduction of large woody debris

What were the results?

The project successfully enhanced habitat diversity across 100 meters of Rosemary’s Leet. Pool-riffle sequences were improved, fish refuge areas created, and erosion near the nearby bridge effectively mitigated. Bank stabilisation using sedge sods and tree planting enhanced long-term resilience. No ecological or structural issues were reported post-works, and the site now supports improved fish passage and habitat complexity.