River restoration at Freelands Estate

For this private client in Wherwell, Hampshire, our role was to restore a degraded 900-metre section of river that had become over-widened and slow flowing, with eroded banks and limited habitat diversity.

Make an enquiry

The River Test is one of England’s most celebrated chalk streams — a rare and delicate habitat that requires careful management to maintain its ecological balance. For this private client in Wherwell, Hampshire, our role was to restore a degraded 900-metre section of river that had become over-widened and slow flowing, with eroded banks and limited habitat diversity.

The project formed part of a wider programme of environmental improvements across the estate, focused on reconnecting the river to its floodplain, enhancing biodiversity, and restoring the natural character of this iconic chalk stream.

What did we do?

Access was carefully planned to protect the adjacent Site of Special Scientific Interest (SSSI) and to avoid disturbance to a large resident water vole population.
Using hardwood matting and selective working zones, we restored 900 metres of channel, introducing a range of in-channel and bankside improvements.

Key works included:

  • Channel narrowing and re-meandering to increase flow diversity.
  • Berm creation using gravels excavated from the nearby floodplain.
  • Large woody debris and faggot installations to enhance flow and habitat structure.
  • Reprofiling and bank stabilisation to prevent erosion.
  • Marginal and riparian planting to establish rapid vegetative cover and stabilise new features.

The design reintroduced riffle–pool sequences, created backwaters and refuges, and improved connectivity between the river and its floodplain — essential for both flood management and ecological resilience.

What were the challenges?

  • Working within a protected SSSI designation under ecological supervision.
  • Managing active water vole burrows along the banks.
  • Stabilising eroded, over-widened sections with minimal impact.
  • Maintaining flow and water quality throughout the works.

What were the results?

The restored river now flows naturally once again, with greater variation in depth, flow, and habitat structure. Monitoring by the Environment Agency recorded a remarkable increase in juvenile salmon (parr) numbers — rising from two in 2022 to twenty-four in the latest survey — clear evidence that the habitat is functioning as intended.

This project has reinstated the natural processes that define a healthy chalk stream: clean gravel beds, varied flows, and connected floodplain habitats.
It stands as a testament to how sensitive, well-planned restoration can deliver measurable ecological gains on one of the UK’s most important river systems.

Channel narrowing and meandering taking place through the production of berms