Lake development at Freelands Estate

Some projects allow us to completely transform a landscape — restoring natural function while creating something both beautiful and ecologically valuable. 
This private estate set within the River Test floodplain, provided exactly that opportunity. The site held enormous potential for habitat enhancement, with low-lying ground, existing spring flows, and connections to one of the UK’s most iconic chalk streams. 

Make an enquiry

Our objective was to design and construct a large wildlife lake and wetland complex to increase biodiversity, improve water quality, and establish a thriving, self-sustaining ecosystem within a sensitive rural setting.

What did we do?

  • A 15,000m² wildlife lake was created, with over 60,000m³ of material moved on site.
  • The works incorporated wetlands and swales to naturally filter and improve water quality before it rejoined the river.
  • The area was previously planted with non-native poplar trees, which were removed and mulched to make way for native species.
  • Due to the high-water table and variable soil conditions, excavation was carried out as a wet dig, using low-ground-pressure machinery and bio-oil-operated plant to minimise environmental risk.
  • To protect the adjacent Site of Special Scientific Interest (SSSI), all access was managed via temporary hardwood matting and gravel tracks.
  • Excavated materials were reused to create stable embankments, shape the lake’s profile, and cap landscaped areas.
  • Recycled riparian and marginal turfs were placed around the new lake margins to create an instant green finish.
  • Native aquatic and marginal planting stabilised banks, filtered nutrients, and provided habitat for fish, amphibians, and invertebrates.
  • The design also included kingfisher banks, wetland shelves, and vegetated buffers, all enhancing ecological function and supporting long-term biodiversity.

What were the challenges?

  • Operating within a sensitive floodplain and SSSI environment.
  • Managing a high-water table and soft, peaty ground.
  • Efficiently moving large quantities of material within limited working areas.
  • Ensuring minimal disturbance to surrounding habitats.

Removal of non-native poplar trees

Creation of wildlife lake

Construction of a bespoke access bridge leading to a small island within the wildlife lake

What were the results?

The completed lake and wetland network now supports an abundance of wildlife including kingfishers, voles, amphibians, and aquatic invertebrates.
Its varied depths, gentle banks, and rich planting provide a range of habitats, while the wetland system naturally filters and improves water quality before it flows back to the river.

This project demonstrates how careful design and construction can restore natural hydrology, enhance biodiversity, and create a landscape that functions beautifully — both ecologically and visually.