A new agricultural bridge was installed over the Bourne Rivulet within a conservation area and flood zone 3. Despite high groundwater, limited access and strict ecological constraints, a low-impact, prefabricated design was delivered within four weeks, blending seamlessly into the chalk stream landscape and improving both access and flood conveyance.

Make an enquiry

R.J. Bull Ltd were commissioned to design and construct a new agricultural access bridge over the Bourne Rivulet, an important tributary of the River Test. The site lay within a conservation area and flood zone 3, meaning the project required a solution that was not only structurally sound but also visually sensitive and compliant with Environment Agency flood risk requirements. High groundwater levels, nearby protected trees, limited site access, and strict planning/ecological timings demanded a dynamic and carefully managed approach.

Project Aims

The primary aim was to provide a replacement vehicle access bridge suitable for agricultural use, while ensuring the design blended sympathetically with the surrounding conservation area. It was essential that the new structure met the Environment Agency’s requirements for flood risk management in a flood zone 3 setting, without compromising the ecological integrity of the Bourne Rivulet. Alongside the technical and environmental requirements, the project had to be completed within a strict four-week construction window to comply with planning and ecological restrictions.

What did we do?

  • To meet the brief, the site was secured with exclusion fencing and a compound was established.
  • Coffer dams were installed to isolate the construction area, with pumped water control implemented to protect the river.
  • Low-carbon reinforced concrete abutments were excavated and cast.
  • Pre-drilled and partially assembled bridge components—including steel beams, timber decking, and handrails—were craned into place.
  • Once the bridge was secured, banks were reinstated, seeded with chalk stream wildflower mixes, and planted with marginal plugs to enhance biodiversity.
  • The finished structure was designed to blend seamlessly with the surrounding conservation landscape

What were the challenges?

  • The project faced high groundwater levels and persistent rainfall throughout construction.
  • Numerous underground services had to be accurately identified and protected.
  • Restricted site access provided very limited space for manoeuvre.
  • Works needed to be delivered within a tight timeframe driven by planning conditions and ecological constraints.
  • Through careful sequencing, adaptive working, and efficient planning, the project was delivered on programme and without delay.

What were the results?

The project successfully delivered an 8m span, 4m wide agricultural bridge, completed within the tight four-week window despite challenging groundwater and weather conditions. Importantly, there were no ecological incidents, and the structure was designed to improve flood conveyance compared with upstream and downstream crossings. The final bridge blended seamlessly with the conservation landscape, meeting both functional and aesthetic requirements.

The project continues…

Beyond the initial brief, R.J. Bull Ltd later returned to restore a 150m section of nearby Winterbourne that had become over-wide, heavily shaded, and lacking ecological diversity. This enhancement not only improved local habitats but also provided long-term biodiversity benefits, adding legacy value to the project.